If you are touring a house near Route 322 and Oak Grove Road this winter, what will the open land at 242 Oak Grove Road look like by the time your mortgage is a few years old?
From the road, it looks like an open question. On paper, it has had answers for almost three years. The size of the building, the height of the dirt berms, the sound wall, the driveway layout, and which stretch of Route 322 gets wider have all been voted on and recorded. On November 16, 2026, the Woolwich Township Committee agenda listed a resolution to accept the developer's performance bonds for the project.
So when you look at a house near this corner, ask where it sits against lines that are already drawn. Whether something will go up there was settled years ago.
One note on addresses before the details. This site is in Woolwich Township, and homes near it often carry a "Swedesboro, NJ 08085" mailing address. I covered how that works in the post on Swedesboro addresses that sit in three different towns. Everything below is Woolwich's record. More on the township itself is on the Woolwich Township page.
How the plan got approved, step by step
The project has had two names along the way. It started as 2024 Oak Grove Road Woolwich, LLC. The current paperwork is under USICVII 242 Oak Grove Urban Renewal LLC. Both cover the same parcels, Block 11, Lots 6, 6.01, 6.02, 6.03, 6.04, 7, 11 and 11.01, and the same building size.
| Date | Body | What happened |
|---|---|---|
| Dec. 18, 2023 | Woolwich Township Committee | Voted 4-1 to authorize a redevelopment agreement with 2024 Oak Road, LLC |
| March 7, 2024 | Woolwich Joint Land Use Board | Heard the preliminary and final major site plan, PB#2023-17, and approved it with conditions |
| Oct. 7, 2024 | Woolwich Township Committee | Adopted Ordinance 2024-19, setting the township's truck routes |
| Dec. 2, 2024 | Woolwich Township Committee | Approved a 30-year PILOT agreement for the warehouse |
| July 28, 2026 | Gloucester County Land Development Review Committee | Approved WO-0130Sp, a 243,360-square-foot industrial site plan, plus a lot line adjustment |
| Nov. 16, 2026 | Woolwich Township Committee agenda | Resolution R-2026-435 to accept performance bonds for the warehouse |
The county's July 2026 report lists the applicant as 242 Oak Grove Urban Renewal, LLC, along with Ferfeldt Investments, LLC and USICVII, and lists the size as 243,360 square feet of industrial space. That is the same size the township's financial-agreement ordinance gave in 2024. The building did not grow between the township vote and the county vote.
The reason this matters to a buyer is time. Residents near the site spoke at the township's Dec. 18, 2023 meeting, which was when the outcome was still open. New Town Press reported that seven residents of Belfiore Drive and Willow Pond Court raised concerns about diesel exhaust, wetlands and traffic. The same report said that after the vote, public input would be limited to specific parts of the design rather than the project as a whole. Someone buying near this corner in late 2026 is past every one of those decision points.
The buffer was set in March 2024
At the March 7, 2024 Joint Land Use Board meeting, the applicant's engineer went through the exhibits. According to the board's minutes, the plan includes:
- a 7-foot sound wall on the buffer, with landscaping
- 5-foot berms along the Route 322 frontage
- 15-foot berms along Oak Grove Road
- irrigation on both road frontages
- a solid fence on the side facing the residents
- security fencing only around the truck parking at the rear
The two frontages are treated differently, and that difference is the most useful thing for a buyer to know. The Oak Grove Road side gets berms three times as tall as the Route 322 side. If you are comparing two houses near this corner, find out which frontage each one faces. A house looking across Oak Grove Road faces a 15-foot planted slope with a sound wall. A house with a view toward the Route 322 frontage faces 5-foot berms. The minutes also say the applicant planned to run the fence past the end of the sound wall to finish the landscaping, a detail that was not on the exhibits shown that night.
The driveway design was also shown at that meeting. The exhibits show a driveway laid out so trucks cannot turn left out onto Oak Grove Road. When the board asked how to cut down truck turning options further, the engineer said a tighter turn radius works best. As a condition of approval, the applicant agreed to narrow the entrance lane, in coordination with emergency services. The engineer also testified that the site has no wetland encroachments. The stormwater basins are to be cleaned out every year, checked every quarter and redone every five years.
None of this tells you how the finished site will sound at 6 a.m. It does tell you the shape of the site, and you can judge a house against that today. You don't have to wait for the walls to go up.
The intersection next door has already changed
Woolwich adopted a truck route ordinance, Ordinance 2024-19, on Oct. 7, 2024. The intersection next to the site has also been rebuilt. In 2023 the Locke Avenue, Route 322 and Oak Grove Road intersection was redesigned. The roads were straightened and widened in every direction, and turn lanes and a traffic signal were added. New Town Press counted that signal as the ninth between the Commodore Barry Bridge in Logan Township and Route 45 in Mullica Hill. If you used to drive 322 a few years ago and haven't since, this stretch now has more stoplights than you remember.
What the township gets, and the road work that comes with it
The PILOT agreement, short for payment in lieu of taxes, is where the township's side of the deal shows up in dollars. New Town Press reported Mayor Natalie Matthias's figures. Under the agreement, Woolwich receives $13,072,221.17 over 30 years. The paper reported that conventional taxation would have brought in $5,764,549.40 over the same period. The township also expects about 60 permanent jobs and 50 to 80 jobs during construction.
The road work matters most to nearby homes. According to the same report, the developer and the state Department of Transportation have to widen Route 322 westbound in front of the building, plus a short section of Oak Grove Road along the property. The township's financial-agreement ordinance also lists improvements to Oak Grove Road and Route 322 as part of the redevelopment agreement. If you are thinking about a house with a driveway onto either road near the site, assume the road in front of you may change. Ask the seller what they have heard about the timing.
This corridor has been built out for years
The 242 Oak Grove Road building is not the first warehouse on this stretch of Route 322. Dermody Properties planned LogistiCenter at Woolwich as a three-building logistics park at Route 322 and Locke Avenue, with buildings of 262,200, 552,585 and 336,700 square feet. Dermody's list of completed projects includes two of them, the 262,200-square-foot building at 275 Locke Avenue and the 336,700-square-foot building at 201 Oak Grove Road. One commenter on the 2025 New Town Press story referred to "all of the other warehouses on Route 322."
West toward the bridge, in Logan Township, the buildings get larger. As of March 2024, its developer described Logan North as a seven-building, 3.2-million-square-foot development. Aramsco leased 117,000 square feet in its 274,000-square-foot building at 301 Crossroads Boulevard. Commodore Business Center North, at Stone Meeting House Road and Route 322, was approved in November 2021 for about 729,499 square feet of warehouse, light-industrial and office space across three buildings. Prologis Park Commodore, a 191,151-square-foot building at 100 Gloucester Court with a Swedesboro address, is marketed on its access to Turnpike Exit 2, I-295 Exit 11 and Route 322.
At 243,360 square feet, the Oak Grove Road warehouse is smaller than the largest Dermody building planned at the same intersection. It adds to a corridor that already has warehouses. For a buyer, that changes the question. Much of the corridor is already built, so the useful thing to compare is how a given house sits against the parts that are fixed: the berm heights, the driveway, and the stretch of road set to be widened.
Questions buyers ask me about this corner
Is the warehouse at 242 Oak Grove Road a new proposal? No. The township approved the redevelopment agreement in December 2023, the Joint Land Use Board heard the site plan in March 2024, and the county approved its site plan in July 2026. Accepting performance bonds was on the township's November 16, 2026 agenda.
Which side of the site has the larger buffer? The Oak Grove Road frontage. It gets 15-foot berms. The Route 322 frontage gets 5-foot berms, and a 7-foot landscaped sound wall sits on the buffer.
Where can I read the source documents myself? The March 7, 2024 Joint Land Use Board minutes and the November 16, 2026 committee agenda are both on the township's website.
I'm happy to drive the Oak Grove Road and Route 322 corner with you, show you which homes face which frontage, and go through the approved site plan before you write an offer. Reach out to Shayden Feret through the contact page. Let's Connect.